Construction of the Breakwater

The breakwater will have to be constructed in sections in precast yards and towed to location, aligned and placed on seabed which will be strengthen by non-dredging method such as “stone column” or “deep cement grouting” to minimize impact on marine ecology.
 
During the casting process, it is possible to “cast-in” special features inside and outside the breakwater structure, hence making it possible to tailor for innovative uses, adding new life and meaning to the otherwise inert structure.

Precast Tunnel Section for ZMH Bridge